Delcam V10 is fastest ever

Delcam's PowerMILL version 10 offers the fastest-ever toolpath generation on multi-processor computers, giving greatly increased user productivity.

The extent of the savings will depend on the size and complexity of the part being machined and on the programming strategies being used. Tests at Delcam indicate that a dual core computer will perform raster machining calculations in around 55 per cent of the time taken by a single core machine. A quad core machine will complete the calculation in around 35 per cent of the time and an eight core machine in around 25 per cent of the time. Other enhancements to further increase productivity include reduced memory usage when programming the largest and most complex parts, and improved ordering to give faster cycle times on the machine tool. The main benefit of PowerMILL 10 is that users can prepare data in the foreground while calculating toolpaths in the background. This eliminates the need for the user to wait for each calculation to be completed before he can start preparing the next operation. For example, it is no longer necessary to wait for a complete roughing path to be produced before work starts on programming the rest-roughing operation. Similarly, the user can be setting the parameters needed to machine one area of a part, while toolpaths are being calculated in the background for machining a second area with a different strategy. Productivity is also increased because the computer can continue with a series of calculations during the user's breaks or even overnight. Calculations can be queued by the operator and the software will automatically start the next operation as soon as each toolpath is generated. This approach can be used with single core equipment, but the benefits are greater with computers having two or more cores. The new multi-threading capabilities allow individual calculations to be divided between the cores in a multi-core machine. This improves calculation times significantly, so increasing user productivity, reducing any down-time where machine tools are waiting for NC data and minimising lead times.